DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY

 

NOTICE OF PROPOSED RULEMAKING

 

The Board of Directors (Board) of the District of Columbia Water and Sewer Authority (DC Water), pursuant to the authority set forth in Sections 203(3) and (11) and 216 of the Water and Sewer Authority Establishment and Department of Public Works Reorganization Act of 1996, effective April 18, 1996 (D.C. Law 11-111, §§ 203(3), (11) and 216; D.C. Official Code §§ 34-2202.03(3) and (11) and § 34-2202.16 (2012 Repl.)); and Section 6(a) of the District of Columbia Administrative Procedure Act, approved October 21, 1968 (82 Stat. 1206; D.C. Official Code § 2-505(a) (2016 Repl.)), hereby gives notice that at its regularly scheduled meeting on November 1, 2018, the Board adopted Resolution #18-72 to propose the amendment of Section 112 (Fees) of Chapter 1 (Water Supply), of Title 21 (Water and Sanitation) of the District of Columbia Municipal Regulations (DCMR).

 

The purpose of these amendments is to amend the miscellaneous fees and charges, permit review fees, pretreatment fees, and add new fees for: events and equipment; fats oil and grease (FOG) facility monthly fee and Cross-Connection/Backflow Prevention fees.

 

The Board requests comments on these proposed regulations. Final rulemaking action shall be taken in not less than thirty (30) days from the date of publication of this notice in the D.C. Register.

 

Chapter 1, WATER SUPPLY, of Title 21 DCMR, WATER AND SANITATION, is amended as follows:

 

Section 112, FEES, Subsections 112.1 through 112.6, are amended to read as follows:

 

112                  FEES

 

112.1               Fees for installation, inspection and removal/abandonment of water and sewer tap or connection, shall be as follows:

 

Inspection Type

Fee

Inspect Sewer Tap Removal/Abandonment

$306

Inspect Pointing Up Sewer Taps

$860

Inspect Insertion of Y-Branch

$306

Inspect Installation of Standard Cleanout

$306

 

Tap Insertion and Abandonment

Fee

Tap Insertion – 1” diameter

$425

Tap Insertion – 1-1/2” diameter

$500

Tap Insertion – 2” diameter

$540

Water Connection

Reimbursable

Water Tap Removal/Abandonment – 2” diameter or less

$400

Water Tap Removal/Abandonment – greater than 2” diameter

$800

 

112.2               Fees for fire hydrants flow tests; fire hydrant meter rentals; rentals of fire hydrant meters with backflow preventer; and for the installation and removal of water bubblers shall be as follows:

 

Fee Name

Fee

Fire Hydrant Flow Test (Field Test)

$300

Fire Hydrant Flow Test (Computer Model)

$200

Fire Hydrant Flow Test (Recent Test Record Available)

$125

Fire Hydrant Use – Water and Sewer Rate

Usage-Based, see 21 DCMR Chapter 41

Letter in Lieu of Hydrant Flow Test

$125

Fire Hydrant Permit Fee

$75

Private Fire Hydrant Flush

$81

3” Fire Hydrant Meter Deposit

$1,600 per rental

3” Fire Hydrant Meter Rental <15 days

$75

3” Fire Hydrant Meter Rental ≥15 days

$5 per day

3” Fire Hydrant Meter w/Backflow Preventer Deposit

$2,200 per rental

3” Fire Hydrant Meter w/Backflow Preventer Rental <15 days

$150 per rental

3” Fire Hydrant Meter w/Backflow Preventer Rental ≥15 days

$10 per day

5/8” Fire Hydrant Meter w/Backflow Preventer Deposit

$700 per rental

5/8” Fire Hydrant Meter w/Backflow Preventer Rental <15 days

$75 per rental

5/8” Fire Hydrant Meter w/Backflow Preventer Rental ≥15 days

$5 per day

 

Installation and Removal of Water Bubblers

Fee

1 Water Bubbler

$262

Each additional Water Bubbler after the first in the same general location

$54

 

112.3               For the purposes of § 112.2, the phrase "in the same general location" means that the distance between the first and last bubbler of the group is eight thousand feet (8,000 ft.) or less. A distance greater than eight thousand feet (8,000 ft.) shall require a separate crew.

 

112.4               Retail customer fees and charges; legal and copying fees; and event and equipment fees shall be as follows:

 

(a)                Retail customer fees and charges shall be as follows:

 

Fee Name

Fee

Customer Bad Check Fee

$25.00

Declined Credit Card Fee

$35.00

Customer Penalty Late Payment Fee

10.00% after 30 days

Additional Penalty Late Payment Fee

1%/month after 60 days,

compounded monthly

New Customer Account Initiation Fee

$50.00

Turn-Off Charges for Non-Payment

$50.00

Reconnection Fee

$50.00

Unauthorized Turn-On

$245.00

Broken Bypass Seal

$700.00

Second Water Audit within 24 months

$125.00

Manual Meter Read1

$20.00/month

                        1 The Manual Meter Read Fee is charged if customer refuses or does not respond to install Automatic Meter Reader or if the meter transmission unit is not transmitting due to the customer’s failure to provide appropriate transmission requirements.

               

(b)               Legal and copying fees shall be as follows:

 

Witness Fee                                                     Salary + Fringe                       

Standard Letter and Legal Pages                   $0.75 per sheet

Photocopying

 

(c)                Event and Equipment fees shall be as follows:

 

Size of Event (Attendees)

Number of DC Water Personnel Per Event1

Cost per Event at $81/hour per person

100 – 2,000

2

$182/hour

2,000 – 5,000

4

$324/hour

5,000 or more

6

$486/hour

1 Refers to the minimum number of personnel required for the event. Upon review of the event specifications, DC Water shall determine the appropriate number of personnel based on the assessed need.

 

Event Equipment

Cost per Unit per Event

Misting Tent1

$550

Mobile Brita Hydration Station1

$600

Cooling Station

$420

Quench Buggy

$2,500

DC Water Mascot

$50

1Refers to a per unit per event, assuming a single day event. For a multi-day event, the per unit cost would be multiplied by the number of days.

 

 

112.5               Fees for engineering reviews both standard and expedited, excessive submission, and as-builts shall be as follows:

 

(a)                Small Plan Review fees (water service 2” or smaller) shall be as follows:

 

 

Fee Name

Standard Fee

Expedited Fee – 15 working days

Water and Sewer Availability Letter (small)

$125

$215

Small Sheet and Shore

$1,000

$1,750

Small basic non-residential project – 1 metered connection

$3,300

$5,800

Small basic non-residential project - 2 metered connections

$6,600

$11,600

Small basic non-residential project – 3 metered connections

$9,900

$17,400

Small basic non-residential project - 4 or more metered connections

$13,200+ Determined on a per project basis

$23,200+ Determined on a per project basis

Small Hybrid Non-Residential - 1 metered connection

$5,000

$8,700

Small Hybrid Non-Residential - 2 metered connections

$10,000

$17,400

Small Hybrid Non-Residential - 3 metered connections

$15,000

$26,100

Small Hybrid Non-Residential project - 4 or more metered connections

$20,000+ Determined on a per project basis

$34,800 Determined on a per project basis

Sanitary or combined Sewer connection - 6” or smaller

$700

$1,200

Storm Sewer Connection - less than 15”

$700

$1,200

Fire Service - greater than 2”

$4,600

$8,100

Single Family Residential – up to 50 metered connections

$700 each up to $25,000

$1,200 each

Town Houses – up to 50 metered connections

$700 each up to $25,000

$1,200 each

Single Family Units or Town Houses - More than 50 metered connections

$700+ each up to 50; and $350 each above 50

$1,200+ each up to 50 and $600 each above 50

Small Non-Residential or Residential Raze Utility Release Letter - No Abandonment

$330

$580

Small Non-Residential or Residential Raze Permit Review and Utility Release Letter - With Abandonments (2)

$700

$1,200

As part of a project review

$300

$600

 

(b)               Large Plan Review fees (water service larger than 2-inch either domestic or fire or both services) shall be as follows:

 

Fee Name

Standard Fee

Expedited Fee – 15 working days

Base Plan Submission Administrative Fee – All Review Types

$140

Not Applicable

Reject Plan Submission Administrative Fee – All Review Types

$75

Not Applicable

Large Permit Basic (per submission)

$10,000

$17,400

Foundation to Grade - Large Commercial

$1,000

Not Applicable

Approved Plan Revision (Field Conditions)

$1,000

$1,750

Large Project Sheeting and Shoring (Large Commercial)

$6,500

$11,300

Abandonment Waiver Request

$500

$880

Water and Sewer Availability Letter (Large)

$500

$880

Temporary Water Connections

$3,300

$5,800

Large Basic Plan Review Fee – 1 metered connection

$10,000

$17,400

Large Basic Plan Review Fee – 2 metered connections

$20,000

$34,800

Large Basic Plan Review Fee – 3 metered connections

$30,000

$52,200

Large Basic Plan Review Fee – 4 or more metered connections

$40,000+ Determined on a per project basis

$69,600+ Determined on a per project basis

Fire Service Only > 2” (no interior renovations)

$4,500

$7,800

Sanitary or Combined Connection 8” or larger

$4,500

$7,800

Sanitary or Combined Connection 6” or smaller

$700

$1,200

Storm Connection 15” or larger

$4,500

$7,800

Storm Connection less than 15”

$700

$1,200

Large Renovation no new water/sewer work - Project Document signoff only (inside a campus)

$400

$700

Large Project Approved Plan Revision (Project Scope/Design Change, or field change) (1)

$1,000

$1,750

Large Project Sheeting and Shoring (2)

$6,500

$11,300

Large water meter size reduction plan (no other work)

$3,300

$5,800

Large Project Raze Utility Release Letter - No Abandonments

$300

$500

Large Project Raze Utility Release Letter - With Abandonments

$700

$1,200

 

(c)                Excessive Submission (Additional Fee for 4th Submission) shall be as follows:

 

Fee Name

Standard Fee

Expedited Fee – 15 working days

Large Plan Excessive Submission Review

$2,400

$4,200

Small Non-Residential Plan Excessive Submission Review

$600

$1,050

Residential Plan Excessive Submission Review (3)

$360

$630

Request for Information (RFI)

$30

$60

Letter in Lieu

$50

$90

Request for As-Built Drawings

$90/man hour

$150/man hour

Water Meter Sizing Computation

$90

$150

Water and Sewer Availability Letter

$500

$880

Delayed Abandonment or Waiver from Standards Letter

$500

$880

Processing of Standard Easement Covenant

$1,000

$1,750

Processing of Non-Standard Easement Covenant

$5,000

$8,750

One Day Plan Design and Review and approval (Velocity type program)

$20,000+ Determined on per project basis

Determined on per project basis

 

(d)               Existing/Proposed As-Built shall be as follows:

 

Fee Name

Fee

Single Family Unit Residential Service Connection - Small Residential

$250

Townhouses or Single Family Units from Multi-Unit Project

$250

Small Non-Residential, Large Service Connection (per connection)

$500

Small Non-Residential Fire Service

$750

Large Non-Residential - water service 3” or larger, sewer service 8” or larger, fire service 3” or larger

$750

New Water or Sewer Main (20 to 100 feet) (each)

$2,500

Each additional 200 feet of water line

$2,000

Each additional 400 feet of sewer main/line

$2,000

If installing more than 200 linear feet or any Water line larger than 24" in diameter

Determined on a per project basis

If installing more than 200 linear feet of sewer or any sewer larger than 60” in diameter

Determined on a per project basis

 

112.6               Waste Hauler Permit and Disposal Fees; Pretreatment Industrial User Permit and Sampling Fees; High Strength Waste Fees; and FOG Facility fees shall be as follows:

 

 

Fee Name

Fee

Waste Hauler Discharge Annual Permit Fee per Vehicle

$30

 

 

Waste Hauling Disposal Fees

 

High strength grease trap waste

$0.07 per gallon

High strength septage waste

$0.07 per gallon

Domestic strength waste

$0.003 per gallon

Low strength waste

$0.003 per gallon

 

 

Industrial User Permit Fees   

 

Permit Initial Fee

$2,500

Permit Renewal Fee

$700

 

 

Industrial User Annual Compliance Fees

 

Significant or Non-Significant Categorical Industrial User

 

1 Outfall

$3,100

2 or more Outfalls

$4,300

 

 

Significant Non-Categorical Industrial User

 

1 Outfall

$3,100

2 or more Outfalls

$4,300

Non-Significant Non-Categorical User

 

1 Outfall

$700

2 or more Outfalls

$900

 

 

High Strength Waste Fees

 

Biochemical Oxygen Demand (BOD)

$0.135 per pound

Total Suspended Solids (TSS)

$0.263 per pound

Total Kjeldahl Nitrogen (TKN) or Total Nitrogen (TN)

$1.471 per pound

Total Phosphorus (TP)

$4.524 per pound

 

 

Fats, Oil and Grease (FOG) Facility Monthly Fee

$13.70 per month

 

Section 112, FEES, is amended by adding a new Subsection 112.12 to read as follows:

 

112.12             Cross-Connection/ Back Flow Prevention Fees and Turn-Off Charges

 

(a)                The Cross-Connection/ Back Flow Prevention Fees and Turn-Off Charges shall be as follows:

 

Fee Name

Fee

Cross-Connection/Back Flow Prevention Monthly Fee per Assembly

$6.70

Cross-Connection Turn-off - 5/8” to 2”

$200

Cross-Connection Turn-off - 3” to 5”

$400

Cross-Connection Turn-off - 6” and larger

$900

 

Comments on these proposed rules should be submitted in writing no later than thirty (30) days after the date of publication of this notice in the D.C. Register to Linda R. Manley, Secretary to the Board, District of Columbia Water and Sewer Authority, 5000 Overlook Ave., S.W., Washington, D.C. 20032, by email to Lmanley@dcwater.com, or by FAX at (202) 787-2795. Copies of these proposed rules may be obtained from the DC Water at the same address or by contacting Ms. Manley at (202) 787-2332.